Wuxi Jinfan Drilling Equipment Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. luo qiang
  • Company Name : Wuxi Jinfan Drilling Equipment Co., Ltd.
  • Tel : 86-0510-88551777
  • Fax : 86-0510-88551771
  • Address : Jiangsu,wuxi,Xitai Road 221, Meicun, Wuxi City, Jiangsu Province, China
  • Country/Region : China
  • Zip : 214112

YG-70 Construction hydraulic Drilling Rig

YG-70 Construction hydraulic Drilling Rig
Product Detailed
Related Categories:Drilling Rig
YG-70 construction drilling rig is a full hydraulic operated top drive power head drill.

1.  Application

YG-70  construction  drilling  rig  is  a  full  hydraulic  operated  top  drive  power  head  drill.  It  is  used  to drill  heavy  duty  pretension  anchor  hole  at  side  slope  of  water  power  station,  railway  or  highway projects,  as  well  as  drainage  holes.  It  also  used  to  prevent  or  solve  geologic  calamity,  such  as landslide  and  rock  collapse  etc.  In  addition,  it  is  also  used  to  drill  small  size  water  well  and  high- pressure  jet  grouting  hole.  Rig  is  already  widely  used  in  various  projects  such  as  water  power  stations situated  in  Yunnan,  Guangxi,  Sichuan,  Guizhou  and  Hubei  provinces,  and  expressways  as  well  such  as

Ninbo-Taizhou-Wenzhou  (in  Zhejiang),  Huangshan-Hangzhou  (in  Zhejiang),  Dali-Baoshan  (in  Yunnan).It  has become  the  first  priority  for  medium-duty  anchoring-reinforcing  projects  in  China.

2.  Features

1)  It  has  great  drilling  capability,  wide  range  of  application  ,  rapid  drilling  speed  and  high  drilling efficiency,  as  well  as  powerful  ability  of  eliminating  accident.

2)  Extension  mechanism  in  the  output  spindle  of  top  drive  power  head  protects  drilling  tools effectively.  It  can  increase  the  hole  inclination  angle  range  and  drill  elevation  angle  hole,  while setting  the  top  drive  power  head  and  hole  top  plate  toward  the  opposite  direction.

3)  A  set  of  front-mounted  adjustable  columns  on  drill  frame  is  used  for  adjusting  the  height  of  mast front-end,  which  makes  it  convenient  to  align  with  working  position.

4)  Rig  structure  is  separate  group  design,  it  assures  good  disassembility  ,  rapid  and  convenient  mount and  transport,  better  working  environment  and  lower  labor  strength  as  well  as  remote  control  and operation.

5)  Mast  can  be  fixed  on  staging  immediately  without  drill  frame  with  auxiliary  parts  (horizontal  axle and  buckles),  which  makes  it  possible  for  greatly  reduce  rig  weight  and  fastener  transport.

6)  The  imported  hydraulic  motor,  other  main  assembly  preferentially  selected  home  made  reputed  and  high quality  products  ensure  its  stable  running  performance,  reliable  product  quality  and  long  service  life. It  has  good  interchangeability  due  to  the  high  grade  of  standardization  and  seriesization  of  wearing parts.

7)  Full  hydraulic  drive  and  operate,  stepless  shift,  simple  operate,  convenient  maintain  and  few wearing  parts.

8)  It  can  be  used  with  various  drilling  method  such  as  carbide  bit  drilling,  anger  drilling,  DTH  hammer drilling,  follow-up  casing  drilling  etc.

1.Hole depth:70-80m

2.Hole diameter:180-130mm

3.Drill rod:73*1500mm;89*1500mm

4.Hole angle range:0-1200

5.Output torque of top drive power head:3200Nm

6.Feeding stroke of top drive power head:1800mm

7.Mast slide stroke:500mm

8.Weight:1400kg

9.Overall dimension of main set:3100*1000*1500mm

10Weight of the heaviest component:200kg

YG-70 Construction hydraulic Drilling Rig



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.